Case studies
What moving actually changed
Every engagement below is written up with the numbers we measured before the migration and ninety days after it.
-63%
median time to first byte, across all migrations
1,480
sites moved onto the platform since 2020
0
minutes of planned downtime in the last 40 cutovers
Featured · Retail
Meridian Supply held four times its usual traffic without a single timeout
A 40,000-SKU catalogue on shared hosting, moved to a three-region setup in nine days — with the checkout path rebuilt around a warm cache.
38ms
cached TTFB
4.1×
peak traffic held
+19%
checkout completion
Every engagement, in order
2023 — 2026
“They audited us for a week before proposing anything, then told us two of our problems were not hosting problems at all. That is when we signed.”
Ralph Edwards
E-commerce Director, Meridian Supply
